Inflatable building
Inflatable buildings are constructed using two layers of membrane connected together to form inflatable 'cushions'. Membranes are usually less than 1 mm thick, and air is used to pressurise the cavity between them to form a 'rigid', structurally stable element, capable of spanning large distances.
Inflatable buildings differ from air-supported buildings, which are formed by a single-layer membrane that is supported by pressurisation of the whole interior of the building. An air-supported building prevents air from being lost when access points are opened by using airlocks, which maintain the level of air pressure inside the occupied space. Inflatable buildings have a lower power requirement than inflatable buildings as they require a lower volume of pressurised air.
Inflatable buildings are typically used for warehouses and other storage facilities, sports facilities, stadia, shopping centres and so on. Since the amount of material used for inflatable buildings is relatively low, they can be portable, with the air allowed to escape before the membrane is packed down to a small volume.
Inflatable structures (or inflatables) can also be used to create specific components such as; escape slides, mattresses, swimming and paddling pools, play slides, bouncy castles, and so on.
Legal requirements apply to the supply, hire and use of inflatable play equipment for commercial purposes, but not to private, domestic buyers and users. Inflatables can be dangerous in terms of user injuries as well as being unsuitable in high winds if inadequately secured.
Inflatables should be checked before buying or hiring for an event to ensure they comply with BS EN 14960. A label should provide information about when the inflatable was made, how many people can use it and their maximum heights. Once the inflatable is fully inflated, it should be inspected prior to use to check that the site is suitable, that the anchorages are secure, and the internal air pressure provides a firm footing.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Download your free guide.
Four new types of prior approval for solar developments
Online Planning Portal application types from 5 September.
Election fails to spark construction industry revival
Contract awards and planning; post election.
Making diversity and inclusion easy for SMEs
The CIOB tool for companies with limited resources.
Sustainable Futures: Redefining Retrofit for Net Zero Living
BSRIA Briefing 2024, initial speakers announced.
Looking back at the UK's first Passivhaus leisure centre
Reflections on St Sidwell’s Point with CIAT.
A-Level results and electrical apprenticeships
Electrical Skills Index highlights areas with skills shortages.
One of the world's more unusual drive-throughs.
A quick introduction.
Hadrian's Wall Path and the national trails
The trails are heritage assets in their own right.
Articles on timely advice and hydraulic lime.
Building Designers Association of Australia
CIAT and BDAA sign Memorandum of Understanding.
Built Environment Inclusive partners issue statement committed to inclusion.
Building regulation requirements can have unintended consequences.
CIOB announces 2024/25 vice president
Sustainability champion Professor Saul Humphrey.
Accelerating towards a net-zero built environment.